Input information //
Electrical details:
Electrical load of 80KW, distance between source and load is 200 meters, system voltage 415V three phase, power factor is 0.8, permissible voltage drop is 5%, demand factor is 1.Cable laying detail:
Cable is directed buried in ground in trench at the depth of 1 meter. Ground temperature is approximate 35 Deg. Number of cable per trench is 1. Number of run of cable is 1 run.Soil details:
Thermal resistivity of soil is not known. Nature of soil is damp soil.Ok, let’s dive into calculations…
- Consumed Load = Total Load · Demand Factor:
Consumed Load in KW = 80 · 1 = 80 KW - Consumed Load in KVA = KW/P.F.:
Consumed Load in KVA = 80/0.8 = 100 KVA - Full Load Current = (KVA · 1000) / (1.732 · Voltage):
Full Load Current = (100 · 1000) / (1.732 · 415) = 139 Amp.
Temperature Correction Factor (K1) When Cable is in the Air
Temperature Correction Factor in Air: K1 | ||
Ambient Temperature | Insulation | |
PVC | XLPE/EPR | |
10 | 1.22 | 1.15 |
15 | 1.17 | 1.12 |
20 | 1.12 | 1.08 |
25 | 1.06 | 1.04 |
35 | 0.94 | 0.96 |
40 | 0.87 | 0.91 |
45 | 0.79 | 0.87 |
50 | 0.71 | 0.82 |
55 | 0.61 | 0.76 |
60 | 0.5 | 0.71 |
65 | 0 | 0.65 |
70 | 0 | 0.58 |
75 | 0 | 0.5 |
80 | 0 | 0.41 |
Ground Temperature Correction Factor (K2)
Ground Temperature Correction Factor: K2 | ||
Ground Temperature | Insulation | |
PVC | XLPE/EPR | |
10 | 1.1 | 1.07 |
15 | 1.05 | 1.04 |
20 | 0.95 | 0.96 |
25 | 0.89 | 0.93 |
35 | 0.77 | 0.89 |
40 | 0.71 | 0.85 |
45 | 0.63 | 0.8 |
50 | 0.55 | 0.76 |
55 | 0.45 | 0.71 |
60 | 0 | 0.65 |
65 | 0 | 0.6 |
70 | 0 | 0.53 |
75 | 0 | 0.46 |
80 | 0 | 0.38 |
Thermal Resistance Correction Factor (K4) for Soil (When Thermal Resistance of Soil is known)
Soil Thermal Resistivity: 2.5 KM/W | |
Resistivity | K3 |
1 | 1.18 |
1.5 | 1.1 |
2 | 1.05 |
2.5 | 1 |
3 | 0.96 |
Soil Correction Factor (K4) of Soil (When Thermal Resistance of Soil is not known)
Nature of Soil | K3 |
Very Wet Soil | 1.21 |
Wet Soil | 1.13 |
Damp Soil | 1.05 |
Dry Soil | 1 |
Very Dry Soil | 0.86 |
Cable Depth Correction Factor (K5)
Laying Depth (Meter) | Rating Factor |
0.5 | 1.1 |
0.7 | 1.05 |
0.9 | 1.01 |
1 | 1 |
1.2 | 0.98 |
1.5 | 0.96 |
Cable Distance correction Factor (K6)
No of Circuit | Nil | Cable diameter | 0.125m | 0.25m | 0.5m |
1 | 1 | 1 | 1 | 1 | 1 |
2 | 0.75 | 0.8 | 0.85 | 0.9 | 0.9 |
3 | 0.65 | 0.7 | 0.75 | 0.8 | 0.85 |
4 | 0.6 | 0.6 | 0.7 | 0.75 | 0.8 |
5 | 0.55 | 0.55 | 0.65 | 0.7 | 0.8 |
6 | 0.5 | 0.55 | 0.6 | 0.7 | 0.8 |
Cable Grouping Factor (No of Tray Factor) (K7)
No of Cable/Tray | 1 | 2 | 3 | 4 | 6 | 8 |
1 | 1 | 1 | 1 | 1 | 1 | 1 |
2 | 0.84 | 0.8 | 0.78 | 0.77 | 0.76 | 0.75 |
3 | 0.8 | 0.76 | 0.74 | 0.73 | 0.72 | 0.71 |
4 | 0.78 | 0.74 | 0.72 | 0.71 | 0.7 | 0.69 |
5 | 0.77 | 0.73 | 0.7 | 0.69 | 0.68 | 0.67 |
6 | 0.75 | 0.71 | 0.7 | 0.68 | 0.68 | 0.66 |
7 | 0.74 | 0.69 | 0.675 | 0.66 | 0.66 | 0.64 |
8 | 0.73 | 0.69 | 0.68 | 0.67 | 0.66 | 0.64 |
According to above detail correction factors:
– Ground temperature correction factor (K2) = 0.89
– Soil correction factor (K4) = 1.05
– Cable depth correction factor (K5) = 1.0
– Cable distance correction factor (K6) = 1.0
Total derating factor = k1 · k2 · k3 · K4 · K5 · K6 · K7
– Total derating factor = 0.93