Input information
Electrical details:
Electrical load of 80KW, distance between source and load is 200 meters, system voltage 415V three phase, power factor is 0.8, permissible voltage drop is 5%, demand factor is 1.Cable laying detail:
Cable is directed buried in ground in trench at the depth of 1 meter. Ground temperature is approximate 35 Deg. Number of cable per trench is 1. Number of run of cable is 1 run.Soil details:
Thermal resistivity of soil is not known. Nature of soil is damp soil.Ok, let’s dive into calculations…
- Consumed Load = Total Load · Demand Factor:
Consumed Load in KW = 80 · 1 = 80 KW - Consumed Load in KVA = KW/P.F.:
Consumed Load in KVA = 80/0.8 = 100 KVA - Full Load Current = (KVA · 1000) / (1.732 · Voltage):
Full Load Current = (100 · 1000) / (1.732 · 415) = 139 Amp.